algorithmic modeling for Rhino
Hi all,
I am trying to set the availability schedule for the ideal loads systems using the AirDetails component (using RunEnergySimulation not OS). However it appears to creating duplicate schedules for each zone.
Tags:
Replies are closed for this discussion.
I realize that, if we're still keeping the EnergyPlus component in the tab, we should fix the bugs in it. I still recommend using the OpenStudio component but you can see that I fixed the bug here:
https://github.com/mostaphaRoudsari/honeybee/commit/5d1689daaadf6b3...
And the attached file works:
Thanks for bringing this to our attention.
-Chris
Welcome to
Grasshopper
Added by Parametric House 0 Comments 0 Likes
Added by Parametric House 0 Comments 0 Likes
Added by Parametric House 0 Comments 0 Likes
Added by Parametric House 0 Comments 0 Likes
© 2024 Created by Scott Davidson. Powered by